Allbet Gaming

Hga030:KPower gets four-year PPA extension

Allbet官网 2022年08月25日 社会 6 0

Hga030www.hg108.vip)是一个开放皇冠即时比分、代理最新登录线路、会员最新登录线路、皇冠代理APP下载、皇冠会员APP下载、皇冠线路APP下载、皇冠电脑版下载、皇冠手机版下载的皇冠新现金网平台。Hga030上登录线路最新、新2皇冠网址更新最快,Hga030开放皇冠会员注册、皇冠代理开户等业务。

In a filing with Bursa Malaysia, KPower said the EC had vide its letter extended the final closing date from June 30 to Sept 30, 2022.

PETALING JAYA: KPower Bhd’s subsidiary – PKNP KPower Suria Sdn Bhd (PKSSB) – has obtained an extension from the Energy Commission (EC) for the development of a 50MW solar photovoltaic plant in Pahang.

In a filing with Bursa Malaysia, KPower said the EC had vide its letter extended the final closing date from June 30 to Sept 30, 2022.

,

新加坡博彩公司www.99cx.vip)是一个开放皇冠体育网址代理APP下载、皇冠体育网址会员APP下载、皇冠体育网址线路APP下载、皇冠体育网址登录APP下载的官方平台。新加坡博彩公司上最新新加坡博彩公司登录线路、新加坡博彩公司代理网址更新最快。新加坡博彩公司开放皇冠官方会员注册、皇冠官方代理开户等业务。

,

KPower said the scheduled commercial operation date had been extended to Dec 31, 2023 from Sept 30, 2023 while the tenure of the power purchase agreement or PPA was from 21 years to 25 years.


转载说明:本文转载自Sunbet。 Allbet Gaming声明:该文看法仅代表作者自己,与本平台无关。转载请注明:Hga030:KPower gets four-year PPA extension
发布评论

分享到:

Allbet Gaming

Allbet Gaming微信:8888

皇冠投注平台出租(www.hg108.vip):Cabinet agrees in principle to disclose LCS audit report
你是第一个吃螃蟹的人
发表评论

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。